· Set a high personal example of safety and environmental behaviour.
· Supervise assistant and site engineers, for instance ensuring they understand the RESS before commencing the shift on setting out methods and techniques.
· Check the shift engineers setting out to ensure it is correct. Also ensure they are following their own responsibilities (testing materials, briefing operatives, filling in check sheets).
· Ensure reasonable survey book standards and daily diaries are maintained by engineers
· Supporting the shift manager.
· Attending and sometimes running the SRG meeting (Shift Review Group).
· Ensure that the 3D information drawings and specification documents contain sufficient, accurate information for construction of the works. Formally request any missing information in sufficient time to allow the programme to proceed without delay.
· Ensure that inspection and test plans are completed and digitally recorded as required by the PMP / Specification, including a check of dimension accuracy and quality.
· Prepare and monitor a 2-4 weeks programme with the SubAgent
· Monitor the work under their control to ensure that any unsafe work conditions and non-compliance with company policies and procedures are promptly remedied.
- Also considering plant, labour, material costs and programme.
· Carry out material take off and requisitions as requested by sub agent / agent.
· Completing Method Statements / Inspection Test Plan / MCRs / Task Briefings and reviewing such documents that have been prepared by others.
· Order materials and maintain register of all orders placed and confirmed.
· Completing Temporary Works Design Briefs and Inspecting temporary works structures once the training has been received.
· Maintain good working relations with client / designer / RE, together with our supply chain.
· Communicate with foremen and gangers to ensure full understanding of information provided.
· Confirm in writing, on the same day, any verbal instructions received from the client / designer / RE’s staff and ensure that comprehensive records of resources employed on additional works are maintained.
· Ensure all delivery tickets are cost coded and passed to accounts dept. for processing.
· Carry out other relevant duties as required from time to time.
|